Nobody shows guests their water tank. But most people in Jakarta know the feeling of running out of water, seeing it turn cloudy, or hearing a pump hum all night next to the bedroom. The septic tank is the same: out of mind until it smells or backs up.

Both sit below the ground floor and are built together with the substructure. Once the house stands, they are difficult and expensive to fix. That is why we build the underground water tank and septic tank of a house the way high-rise buildings build them, not as a simple concrete box under the carport.

Why a PIK house needs a large water tank

In the coastal districts of North Jakarta, mains water is not always reliable. Volume can drop at certain hours, and quality can change without warning. A home built for comfort needs filtered water that practically never runs out, whatever happens to the supply outside.

The answer is a generous reserve. As a baseline, the Indonesian plumbing design standard, SNI 03-7065-2005, uses a household demand of 120 litres per occupant per day.[1] For a family of four with two live-in staff, we design for a minimum net tank volume of 6 m³. Two 1,500-litre tanks on the roof add another 3 m³, for a total reserve of 9 m³. This is roughly how long that water lasts if the mains supply stops completely:

Use per person per dayHousehold use (6 people)Underground tank only (6 m³)With roof tanks (9 m³)
120 litres (standard baseline)720 litres8 days12 days
200 litres (more comfortable lifestyle)1,200 litres5 days7 days
250 litres (luxury home, many bathrooms)1,500 litres4 days6 days

The 200 and 250 litre figures are our own assumptions for homes with more bathrooms, rain showers and bathtubs, not standard values. The estimate also leaves out garden irrigation, car washing and topping up a pool, and a little water at the bottom of the tank always stays below the pump intake. If your home has needs like these, we size the tank for them.

Three chambers in one tank

Our underground water tanks are divided into chambers with separate jobs:

  • A raw water chamber, holding mains water before filtration.
  • A clean water chamber, holding filtered water ready to supply the house.
  • A pump and filter room, an open chamber at the same level with full standing headroom, so maintenance is done standing up, not crawling.

For the people living in the house, this means:

  • Water keeps flowing during cleaning. One chamber can be drained and cleaned while the other keeps serving the house.
  • A tidy ground floor. Filters, pumps and pipework don't clutter the side garden or service area.
  • A quieter home. The pumps run underground, away from bedrooms and living spaces.
  • Better water quality. Good filters and pumps work in a dry room that is easy to service.

Part of the structure, not a separate box

Our water tanks and septic tanks stand on piles and are cast as one with the substructure of the house. There are two main reasons, and we apply the same principle to the pipes.

Settlement. PIK sits on soft ground that keeps settling. A tank that simply rests on the soil can settle differently from the building next to it, cracking its walls or snapping pipe connections. Supported on piles and tied into the structure, the tank moves with the house. Pile depth is explained in Pile Foundations for a House in PIK.

Uplift. The water table in PIK is shallow. When the tank is empty, for example during cleaning, the groundwater around it pushes it upward, like a boat floating. So we also design the piles under the tank as tension piles that hold it down. Checking resistance to uplift is part of the Indonesian geotechnical design requirements.[2]

Pipes that don't depend on the soil. The same principle applies to the water and waste pipes under the ground floor. A house on piles barely moves, while the soil beneath its floor keeps settling and eventually leaves a void. A pipe that simply rests on the soil loses its support, sags, and its joints leak or break. So we tie the pipes under the floor to the substructure, and they stay fixed to the building even when the soil below them drops.

Concrete alone is not watertight

In our experience, we have never seen a concrete tank wall come out of the pour perfectly watertight. Fine shrinkage cracks and the joints between pours are its natural weak points. So we never rely on concrete alone. Our sequence:

  1. Cast in the dry. During casting, dewatering is controlled so groundwater doesn't push against young concrete. The concrete contains a waterproofing admixture, and every construction joint gets a waterstop.
  2. Let the concrete cure. The concrete is cured until it is strong enough to be tested.
  3. Test from outside. Dewatering stops and the groundwater rises back against the walls and floor of the tank. From inside, we check every damp or seeping spot.
  4. Seal the weak points. The groundwater is lowered again, and every weak or seeping spot is sealed with crystalline and cementitious waterproofing, from outside and inside.
  5. Test again. The test is repeated until nothing seeps.
  6. Only then backfill. The excavation around the tank is filled only once the tank is completely tight.

The tank is also tested from inside: it is filled with water, the level is watched, and the outer faces are checked for seepage. The water level alone can't be the only measure, because temperature, evaporation and absorption by new concrete all affect the reading. The American Concrete Institute's standard for testing concrete tanks accounts for these factors too.[3] For us, checking the concrete surface directly for seepage remains the most convincing evidence.

A septic tank that doesn't leak into the ground

The septic tank is built the same way: on piles, tied into the structure, and tested before backfilling. For a septic tank, watertightness works in both directions. Wastewater must not leak into the soil around the house, and groundwater must not leak in, because it fills the tank quickly and disturbs the treatment process.

Our septic tanks have three chambers:

  • First chamber, digestion. Solids settle and are broken down by bacteria without oxygen.
  • Second chamber, filter. The water flows through zeolite and palm fibre. Their large surface area gives bacteria room to continue the treatment.
  • Third chamber, final settling. Remaining particles settle before the water flows into the estate's sewer main.

Adding a filter stage like this is in line with the Indonesian septic tank standard, SNI 2398:2017. The standard does not allow septic tank effluent to be discharged straight into the environment, and offers a filter as one of the further-treatment options for areas with a high water table, such as PIK.[4]

How big should the septic tank be?

In the houses we build, only toilet waste goes into the septic tank. Water from showers, basins and the kitchen runs separately to the estate's sewer main. SNI 2398:2017 calls this a separate system, and sizes the septic tank from two parts: room for the wastewater to stay in the tank for a set time, and room for the sludge that builds up until the tank is emptied.[4] The retention time gives solids the chance to settle and break down before the water leaves. For the same six-person household, we take the upper end of each range in the standard:

ComponentSNI 2398:2017 formula (separate system)Calculation (6 people)
Daily toilet wastewater20 litres/person/day × occupants20 × 6 = 120 litres
Wastewater volumedaily wastewater × 3-day retention120 × 3 = 360 litres
Sludge volume40 litres/person/year × occupants × 3 years40 × 6 × 3 = 720 litres
Septic tank requirementplus 30 cm of freeboard above the waterabout 1.1 m³ + freeboard

The standard also sets a minimum septic tank size: 0.75 m wide, 1.5 m long and 1.5 m high including freeboard, or about 1.7 m³. For a six-person home, this minimum is what governs.

On top of that come the filter chamber and the final settling chamber. We design the whole tank, including both, at a minimum of 3 m³, so the septic chamber itself still meets the SNI minimum size, with headroom if the household grows.

The calculation assumes the tank is emptied every three years. Regular emptying is part of looking after the house: without it, sludge fills the space meant for wastewater, the retention time shrinks, and the water that leaves the tank is dirtier.

What to ask your contractor

Water tanks and septic tanks are often left out of quotes, then appear as extra costs after the contract is signed.[5] Before choosing a contractor, ask:

  • What is the net volume of the water tank, and how was it worked out for the number of people in your household?
  • Do the water tank and septic tank stand on piles and form part of the structure?
  • Has groundwater uplift been designed for?
  • How big is the septic tank, and is it sized to SNI 2398:2017?
  • How are the pipes under the floor supported if the soil below them settles?
  • How is the tank tested for watertightness, and when is backfilling allowed?
  • Where do the pumps and filters go, and how are they maintained?

Our guide to comparing contractor quotes explains how to read a quote line by line, and Building a House in PIK, Stage by Stage covers the whole sequence from planning to handover.

If you are planning a house in PIK or North Jakarta, tell us how many people will live there and how you use water. See also why clients choose Rimba.

References

  1. Badan Standardisasi Nasional (Indonesian National Standards Agency). SNI 03-7065-2005 Plumbing system design procedure (water use table: houses, 120 litres per occupant per day).
  2. Badan Standardisasi Nasional. SNI 8460:2017 Geotechnical design requirements, clause 9.3.3 Resistance to sliding, uplift and overturning.
  3. American Concrete Institute. ACI SPEC-350.1-22 Tightness Testing of Environmental Engineering Concrete Structures.
  4. Badan Standardisasi Nasional. SNI 2398:2017 Septic tank design procedure with further treatment, clauses 4.2.1 (design criteria and volume formula) and 4.2.2 (further treatment).
  5. Rimba Construction. How to Compare Contractor Quotes.

Frequently asked questions

How big should a home's underground water tank be?

Start from water use per person. The Indonesian plumbing standard uses 120 litres per occupant per day for houses. For a household of six, we design for at least 6 m³ net underground, plus two 1,500-litre roof tanks. The total of 9 m³ lasts roughly 6 to 12 days depending on lifestyle, before garden and pool use.

Why divide the tank into chambers?

To keep raw and filtered water apart, to clean one chamber without cutting off the house, and to give pumps and filters a dry room that is easy to service and can't be heard inside the house.

Why does a water tank need piles?

PIK sits on soft ground that keeps settling. A tank on piles, tied into the structure, moves with the house, so its walls and pipes don't crack. The piles also hold the tank down against groundwater uplift when it is empty.

Is a concrete tank automatically watertight?

No. Fine shrinkage cracks and construction joints are natural weak points. The tank has to be tested, seeping spots sealed, and tested again before the excavation is backfilled.

How big should the septic tank be for six people?

If only toilet waste goes in, the SNI 2398:2017 formula at the top of its ranges (20 litres per person per day, 3 days' retention, 40 litres of sludge per person per year, emptying every 3 years) gives about 1.1 m³ plus freeboard. The SNI minimum size of about 1.7 m³ governs. With the filter and final settling chambers added, we design the whole tank at a minimum of 3 m³.

What is the difference between a basic septic tank and one with a filter chamber?

A filter chamber holds media such as zeolite and palm fibre, where bacteria continue breaking down the waste, so the water that leaves is cleaner. The Indonesian septic tank standard recommends this kind of further treatment where the water table is high.

Plan it right from the start

Tell us where your land is, its size, your architect or consultant (if you have one), and when you plan to start. Our team will review it and get back to you.