What to ask for before your foundation is designed.
If you are planning a house in Pantai Indah Kapuk (PIK) or elsewhere in North Jakarta, you will probably be told early on that a "soil test" has been done or is needed. In Jakarta, that phrase often means one thing: a cone penetration test (CPT), which local engineers call sondir. It is a useful test. On the soft, layered ground of PIK, it is rarely enough on its own to design pile foundations with confidence.
This article explains what a complete soil investigation includes, how a CPT differs from a borehole, how deep the investigation should go, and how to think about the cost.
Much of PIK sits on reclaimed land and former fishponds, built over soft coastal clay. That soft clay can be many metres thick and keeps compressing for years after filling. Within it there are often thin, harder layers of dense sand or stiff clay, which engineers call lenses. A lens can look like solid ground on a test chart, while the ground below it turns soft again.
For a house, this means two things. The foundation almost always needs piles that reach a genuinely firm layer, and the design of those piles depends entirely on how well the ground below your plot has been investigated.
A complete soil investigation combines field tests, soil sampling and laboratory testing. The Indonesian geotechnical design standard, SNI 8460:2017, describes investigation for pile foundations as including boreholes, disturbed and undisturbed sampling, and both field and laboratory tests.[1]
The goal is simple: to know the layers beneath your plot, the properties of each layer, and where the layer strong enough to carry your house actually is.
In a CPT, a cone is pushed into the ground while the resistance at its tip and the friction along its sleeve are recorded.[2] The result is a continuous profile from the surface down to the depth where the equipment stops. It is quick, relatively inexpensive and very good for a first picture of the ground.
In PIK, it has three important limits:
An electric CPT with pore pressure measurement (CPTu) gives more detailed data and can estimate how quickly soft clay consolidates.[1] It still recovers no soil.
A borehole is drilled down to a planned depth. Along the way, three things are done that a CPT cannot replace:
The samples then go to the laboratory. For piles in soft ground, the key tests are:
This is not a choice between one or the other. The CPT gives a fast, continuous profile; the borehole gives samples, laboratory data and certainty about what lies beneath a hard layer. SNI 8460:2017 requires at least one borehole or trial pit with sampling, to identify and classify the soil, with samples from every layer that may affect the building.[1] The only exception is where local experience is sufficient to interpret field tests without doubt, which is hard to claim on lensed ground such as PIK. The same standard also sets the order: if both are done, the CPT comes first, and the borehole is placed far enough away not to hit the CPT hole.[1]
SNI 8460:2017 requires drilling to a depth at which all the layers affected by the building's load are known.[1] For piles, that means the investigation must go beyond the planned pile tips, not stop at them. Eurocode 7, the European geotechnical standard that is widely used as a reference, gives a guide of at least 5 metres below the planned pile tip, or more for large piles or pile groups.[6]
In our experience in PIK, house piles typically go 15 to 38 metres deep. An investigation that stops at 20 metres, or wherever the CPT rig can no longer push, may not answer the most important question: is the layer the piles will stop in genuinely thick and strong?
A planned depth is only an estimate. Our practice is that if a borehole reaches its planned depth, for example 30 metres, without reaching the SPT values the engineer has set as the target for a firm layer, it is deepened by a further 10 metres, and again if needed, until that layer is found. Agree a price per extra metre in advance, so the investigation is not stopped at a contract depth before it has answered the question.
We understand that boreholes can feel like an extra cost for something you will never see. As a rough guide, a CPT in Greater Jakarta typically costs one to three million rupiah per point. Deep boreholes with SPT and laboratory testing cost more, from several million to tens of millions of rupiah, depending on depth, the number of points and the laboratory tests required.
Set that against what it protects. Building a luxury house in PIK can cost from over ten billion to several tens of billions of rupiah, all of it standing on a foundation designed from this data. Foundation mistakes are very hard to correct once a house is built. Where correction is possible at all, it costs far more than the investigation would have, and the house is often uninhabitable while the work is done.
A complete soil investigation is the least expensive way to make sure the whole value of your house stands on the right base.
A good report is not just numbers; it also needs to be read by the right people. Check that yours includes:
This data is then interpreted by a geotechnical engineer and the structural consultant to choose the type, size and depth of the piles. At Rimba, we advise every client to add boreholes to the CPT before the pile foundation is designed, and the structural design is prepared by an independent structural consultant, PT Cipta Sukses.
If you are planning a house in PIK or North Jakarta, see how we work, or talk to us before your soil investigation is commissioned.
It is a good first step, but rarely enough on PIK's soft, lensed ground. The CPT can stop on a thin hard layer and miss the soft ground below it, and it recovers no soil. Boreholes with SPT and laboratory testing fill those gaps.
A CPT pushes a cone into the ground and records resistance continuously, without taking samples. A borehole is drilled, with SPT tests and soil samples taken for laboratory testing, including the consolidation tests needed to estimate settlement and downdrag on piles.
Indonesia's SNI 8460:2017 requires investigation until all layers affected by the building's load are known. For piles, the investigation must go beyond the planned pile tips; Eurocode 7 gives a guide of at least 5 metres below the tip. If the target SPT values have not been reached at the planned depth, the borehole should be deepened, for example 10 metres at a time, until a firm layer is found.
As a rough guide, a CPT in Greater Jakarta costs about one to three million rupiah per point, while deep boreholes with SPT and laboratory tests range from several million to tens of millions of rupiah, depending on depth, number of points and tests. That is small compared with the value of the house and the cost of a foundation mistake.
Tell us where your land is, its size, your architect or consultant (if you have one), and when you plan to start. Our team will review it and get back to you.
ContactKontak
Tell us where your land is, its size, your architect or consultant (if you have one), and when you plan to start. Our team will review it and get back to you.Ceritakan lokasi lahan, luas lahan, arsitek atau konsultan (jika ada), dan rencana waktu mulai. Tim kami akan meninjau dan menghubungi Anda.
©2026 Rimba Construction. All Rights Reserved.Hak cipta dilindungi undang-undang.
OFFICEKANTOR
PT. RIMBA BANGUN PERKASA
Galeri Niaga Mediterania E8E
Pantai Indah Kapuk
Jakarta Utara 14460
T.Â
C.Â
E.Â
Menu
OfficeKantor
PT. RIMBA BANGUN PERKASA
Galeri Niaga Mediterania E8E
Pantai Indah Kapuk
Jakarta Utara 14460
Menu
Social MediaMedia Sosial
©2026 Rimba Construction. All Rights Reserved.Hak cipta dilindungi undang-undang.